
F46 Encapsulated Control Line Tubing 1/8" OD
Contact Person : Dan Zhang
Phone Number : 86-13679121121
WhatsApp : +8613679121121
Minimum Order Quantity : | 1 reel | Price : | USD/EURO/RMB |
---|---|---|---|
Packaging Details : | WOODEN REEL +WOODEN CASE | Delivery Time : | ONE WEEL |
Payment Terms : | L/C, T/T, | Supply Ability : | 1000 TONS PER MONTH |
Place of Origin: | China | Brand Name: | Tiptop |
---|---|---|---|
Certification: | ISO 9001 | Model Number: | F40 |
Detail Information |
|||
Material: | F40 | Technique: | Cold Drawn |
---|---|---|---|
Standard: | ASTM A269 | Processing Type: | Seamless & Welded |
Produce Name: | Encapsulated Control Line | Length: | According To The Sizes |
High Light: | 316L F40 Encapsulated Control Line,F40 Encapsulated Coiled Line Pipe,F40 Encapsulated Control Line |
Product Description
Bare tube Material | Encapsulation material | OD (inch) | Wall Thickness (inch) | Working Pressure (MPa) | Length (M/Pcs) |
Austenitic steel 304L (UNS S30403) Austenitic steel 316L (UNS S31603) Duplex 2205 (UNS S32205 & S31803) Super Duplex 2507 (UNS S32750) Incoloy 825 (UNS N08825) Inconel 625 (UNS N06625) | F40 F46 FEP (Fluorinated Ethylene Propylene) PVC (Polyvinyl chloride) Nylon Encapsulated etc.. | 1/8” | 0.025”, 0.035”, 0.049” | 80--120 | 50--4000 |
1/4” | 0.035”, 0.049”, 0.065” | 60--120 | 50--3000 | ||
3/8” | 0.035”, 0.049”, 0.065” | 60--120 | 50--2500 | ||
1/2” | 0.035”, 0.049”, 0.065” | 60--120 | 50--2000 |
When you want to reduce the risk of leakage in your hydraulic line, and reach a high resistance to corrosion at high temperature working environment, consider Tiptop encapsulated control line.
•Process Method: Cold Drawn / Cold Rolled.
•Surface Finish: Bright Annealed
•Grade:
TP304, TP304L, TP316 / 316L
Duplex 2205 (UNS S32205 & S31803)
Super Duplex 2507 (UNS S32750)
Incoloy 825 (UNS N08825)
Inconel 625 (UNS N06625)
•Standard:
ASTM-A 269/ASTM-A 632/ASTM-A 789/ASTM-B 704.
•Size:
OD:1/8” ~ 1”
Wall thickness:0.02,0.028,0.035,0.049,0.065.0.083
•Tolerance: Follow customer request.
•Length: According To Customers' Requests.
•Marking on pipes: As Customer's Requirement.
•Certification: EN 10204.3.1
•Packing: Wrapped on wooden reel, and surface protected by plastic bags,finally packed into wooden case or iron case.
•Delivery Time: One week for general grades
•Way of transportation: FOB, CFR, BY SEA,BY AIR or Express
•Applications:
Chemical injection mandrels
well completions
Pneumatic and hydraulic controls
Subsea ty valves
Heat and steam tracer lines.
Testing Information The following Test Reports are available on request :
1. Compatibility of Tube-Tec Encapsulation Materials with Oilfield Fluids at Elevated Temperature and Pressure.
2. Assessment of Mechanical Integrity of Encapsulated Tubing.
3. Abrasion Testing - Encapsulated Tubing
4. Chemical Injection Line - Flow Rate Tests.
Enter Your Message