Chemical Injection SCSSV Steel 304L Control Line Tubing
Contact Person : Dan Zhang
Phone Number : 86-13679121121
WhatsApp : +8613679121121
Minimum Order Quantity : | Negotiable | Price : | Negotiable |
---|---|---|---|
Packaging Details : | Seaworthy wooden cases or wooden reels | Delivery Time : | One Week |
Payment Terms : | T/T | Supply Ability : | 1000 tons per month |
Place of Origin: | CHINA | Brand Name: | TIPTOP |
---|---|---|---|
Certification: | ISO | Model Number: | 1 / 8 * 0.035 |
Detail Information |
|||
Material: | UNS N06625 | Standard: | ASTM-A 269 ASTM-A 632 ASTM-A 789 ASTM-B 704 |
---|---|---|---|
Length: | According To The Sizes | Processing: | Bending, Welding, Cutting |
WT: | 0.02"-0.083" | Product: | UNS N06625 SS Hydraulic Control Line Tubing 60-120 Mpa |
High Light: | 120Mpa Stainless Steel Coiled Tubing,UNS N06625 SS Coiled Tubing,Control Line SS Coiled Tubing |
Product Description
Incoloy 625 is a nickel-based alloy having both high strength and excellent water resistance to corrosion. Strength of the alloy is from 625 to effect a solid solution of molybdenum and co. 625 alloys have excellent weldability, normally used for welding AL-6XN® alloy. Matching filler metals are also used to connect dissimilar metals.
Chemical Composition
Material | UNS | C | Mn | P | S | Si | Ni | Cr | Mo | N | Cu | Fe | Al | Ti | Cb+Ta |
625 | N06625 | 0.10 | 0.50 | 0.015 | 0.015 | 0.50 | min 58.0 | 20.0-23.0 | 8.0-10.0 | ... | ... | 5.0 | 0.4 | 0.40 | 3.15-4.15 |
Specifications
OD | WT | Materials | Standard | Working Pressure | Length |
1/8" | 0.02", 0.028", 0.035" |
Inconel 625 (UNS N06625) |
ASTM-A 269 ASTM-A 632 ASTM-A 789 ASTM-B 704 |
60-120 Mpa | Customized |
3/16" | 0.02", 0.028", 0.035", 0.049" | ||||
1/4" | 0.02", 0.028", 0.035", 0.049", 0.065", 0.083" | ||||
5/16" | |||||
3/8" | |||||
1/2" | |||||
* OD: Up to 1" |
FAQ
Q1: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q2: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q3. Can you provide customize service?
A: Yes.Pipes can be customized as per the customers' request.
Q4. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable.
Enter Your Message